News Flash

City of Manhattan News

Posted on: September 20, 2019

Manhattan Regional Airport Runway and Taxiway

photo of a plane on the runway at Manhattan Regional Airport

Reconstruction of the Manhattan Regional Airport Runway & Taxiway is one of the six projects dedicated to the 0.3% sales tax initiative on the ballot November 5, 2019.

The existing runway is nearing the end of its useful life and needs to be reconstructed.  The 2013 airfield pavement management report conducted by the Department of Defense indicated that the condition of the runway pavement ranges from serious, to very poor, to fair. Pavement shoulders are recommended for runways accommodating larger aircraft and are included in the project.

The taxiway connecting aircraft from the terminal apron to runway is also in very poor condition and in need of complete reconstruction. The 2014 pavement condition index study (provided by KDOT) scored the pavement at 11-40 out of possible 100, indicating that major rehabilitation is needed. Almost all of the panels in this concrete pavement have medium to high severity cracks. A number of cracks have loose particles, which are creating debris and are hazardous to aircraft.

The design and construction of this project is eligible for Airport Improvement Program funds from the Federal Aviation Administration (FAA) at a 90/10 cost share; where the City will only pay a 10% local share.

In 2018, MHK again saw a record number of enplanements (over 70,000). American Airlines provides daily flights to Chicago and Dallas, and in recent years has increased seat capacity to both hubs with larger aircraft flying to Dallas and a third daily flight to Chicago.

airport project timeline graphic

Facebook Twitter Email

Other News in City of Manhattan News

map of alternate routes to K-State Athletics Facilities and Event Parking

Alternate Routes for Game Day Traffic

Posted on: November 14, 2019
photo of Brenda Wolf

Brenda Wolf Named City Clerk

Posted on: October 24, 2019
photo of Tuttle Creek Lake from the east shore

Tuttle Creek Lake Update

Posted on: October 15, 2019
photo of bypass pipes for sewer operations at sink hole locations

Sink Hole Updates 10/15/2019

Posted on: October 15, 2019
Undersized large-vehicle storage bays

City Maintenance Facility

Posted on: September 18, 2019
photo of exposed storm sewer on Bertrand Street

Bertrand Storm Sewer Repairs

Posted on: September 13, 2019
photo of two men standing near the Hayes Drive sinkhole

Sinkhole Updates

Posted on: September 9, 2019
photo of sink hole at Hayes Drive and Levee Drive

Flood damage update 9/4/2019

Posted on: September 4, 2019
photo of a woman working on a spreadsheet

Commission approves 2020 budget

Posted on: September 4, 2019
the view of Warner Park from tee 9, trees, meadow, and park shelter

A new vision for Warner Park

Posted on: September 3, 2019
logo for the sales tax initiative

0.3% Sales Tax Initiative

Posted on: August 16, 2019